NPCIL can't fund the entire nuclear program, so support was sought from cash-rich PSUs like NTCP and IOC is essential. Power consumers on board are NALCO and Indian Railways. Govt has solved suppliers risk issues (for foreign & domestic) through insurance, and has identified land & foreign tech partners. Funding tie-up with PSUs will double future construction plans. Govt is negotiating bulk orders (of 6 reactors) to considerably lower the costs, as well as leverage foreign tech transfers and Make in India (see link 1).
Fast breeder plants (that recycle & reuse hazardous wastes) and new-gen advanced thorium plants (see link 2) are expected to be 9.3GB. Thus out of 63GB total, 53.7GB are based on first gen tech, 33.9 GB foreign & 19.8 GB indigenous (see below).
Capacity (in MB): _______ 6,780 _ 4,800 __ 16,100 __25,000
Current U/C Plan 2023 Beyond
upto 220MB indigenous: 3700
540 MB indigenous: 1080
700 MB indigenous: 2800 5600 5600
1000MB Russian: 2000 2000 4000 4000
1000MB US + 1650MB French: 6500 15400
Nuclear-power projects: PSU leverage for imported reactors